Speak with expert. Give us a call: 1300 861 325
High Rise Basement Dewatering
OVERVIEW
High Rise Basement Dewatering

ENV Solutions was engaged to dewater a two-level basement for a 12-story residential building at the Gold Coast. The project required deep wells and spear-point systems, with the installation of over 90 well points at depth to manage groundwater for construction. The process, including physicochemical correction and metals (iron) treatment spanned 26 weeks with flow rates up to 30L/s. ENV provided a comprehensive dewatering strategy, ensuring compliance and effective water treatment.

Related Case Studies

Naval Facility PFAS Water Treatment

Read Case Study

Fuel Station Dewatering & Remediation

Read Case Study

Diesel Spill Remediation

Read Case Study